Choose Product
Select your product, size, and add-ons that best match your needs.
Select your product, size, and add-ons that best match your needs.
Upload your artwork or request design assistance before placing your order.
Complete checkout, receive a proof, and approve the final artwork.
We print your approved order and ship it directly to your doorstep.
The Portable Exhibit Display 3m x 3m - Model 11 is a custom-printed display solution for trade shows, exhibitions, and branded events.
Single or Double-Side graphics can be printed
100% pure polyester fabric - 260 gsm
Tool-free effortless assembly
Wrinkle-resistant tension fabric with zip lock at the bottom
Product Specifications:
Hardware: Aluminium Bungee-corded frames with two wide steel bases
Graphic: Polyester fabric 260gsm
Print Method: Dye Sublimation CMYK printing
Carry Case: Nylon Carry Bag
This product comes with a standard2-years warrantyagainst Aluminium Frame for manufacturing defects. This warranty does not cover damages caused by accidents, abuse, or regular wear and tear. If the product is found to be defective, it will be repaired or replaced by Backdropsource.
The final decision of replacement will be at the discretion of Backdropsource.
FABRIC CARE
All of Backdrop Source's banners are wrinkle-resistant and machine-washable. Our fabrics stay fade-free over many washes. Easily foldable and portable, your curved fabric banner will resist crumpling or wrinkling over many commutes and road trips.
Kit Includes :
Optional Accessories:
Frame size can be customised as per your requirement. Contact us
Portable Exhibit Display - S shape - 1m Wide x 2.7m Height
Frame dimension : 1m wide x 2.7m height
Graphic Dimension : 1000mm wide x 2580mm height
Package Dimension : 27cm x 27cm x 74cm
Portable Exhibit Display ( Rampant ) - 2m Wide x 2.5m Height
Frame dimension : 2m wide xΒ 2.3m/2.5m height
Graphic Dimension : 2000mm wide xΒ 2280mm/2524mm height
Package Dimension : 65cm x 35cm x 10cm *1pcs
Rectangle Counter - 0.8m Wide x 1m Height x 0.5m Depth
Frame Dimensions : 0.8m Wide x 1m Height x 0.5m Depth
Graphics Dimension : 2200mm width x 1025mm height
Package Dimension : 84cm x 12cm x 58cm
LED Light with Light Holder
Material : Aluminium, LED Bulbs
Adapter : 12V / 1.5A / 3.5m Wire
Power : 5W, 700LM
Total Weight : 35kgs
Just in case, you want to give us your own designs, we accept them when it meets the following specifications: